Key points · What good compliance looks like
- A risk-based testing schedule, not a blanket annual assumption
- Testing carried out by a competent, insured engineer
- Clear pass/fail labelling on every item tested
- A digital or paper asset register and certificate you can produce immediately if asked
- A rolling programme so nothing falls overdue between visits
In this guide
Every UK business relies on electrical equipment, and every piece of it carries a small but real risk: a worn cable, a cracked plug, a fault hiding inside a kettle or a monitor. Portable Appliance Testing (PAT testing) is how businesses catch these risks before they cause an accident, a fire, or an insurance dispute.
If you're responsible for a workplace — an office, a hotel, a kitchen, a shop, a warehouse — this guide explains what the law actually requires, how often testing should happen, and what "good compliance" looks like in practice.
What is PAT testing?
PAT testing is a combination of a visual inspection and an electrical test carried out on portable and movable electrical appliances — anything with a plug, from laptop chargers and kettles to power tools and catering equipment. It checks for things like damaged cables, incorrect wiring, earth continuity, and insulation resistance, and results in a pass/fail label and a certificate you can produce as evidence.
What does the law actually say?
A common misconception is that "PAT testing" is a named legal requirement. It isn't. But the underlying duty to keep electrical equipment safe absolutely is, and it comes from a few overlapping pieces of legislation:
- The Electricity at Work Regulations 1989 — Regulation 4(2) requires that electrical systems be "maintained so as to prevent danger." This is the core legal basis employers rely on.
- The Health and Safety at Work etc. Act 1974 — places a general duty on employers to protect the health and safety of employees and visitors, which extends to the equipment they use.
- PUWER 1998 (Provision and Use of Work Equipment Regulations) — reinforces the duty to maintain work equipment, including electrical items, in a safe condition.
None of these say "you must PAT test every 12 months." What they say is that you must be able to demonstrate your electrical equipment is safe — and PAT testing, carried out by a competent person and properly recorded, is the industry-recognised way of proving that.
How often should PAT testing be carried out?
There's no single legal interval — the right frequency depends on the equipment, how it's used, and the environment. As a general guide:
- Low-risk office equipment (PCs, monitors, printers) — every 2–4 years
- Higher-use items (extension leads, kitchen appliances, handheld tools) — every 6–12 months
- Construction and industrial equipment — every 3–6 months
- Equipment in public-facing premises (hotels, care homes, hospitality venues) — typically every 6–12 months, reflecting higher footfall and higher consequence if something goes wrong
Getting the interval wrong in either direction is a real cost — too infrequent, and you're carrying unassessed risk; too frequent, and you're paying for testing you don't need. A competent provider will set a schedule based on your actual risk profile, not a one-size-fits-all number.
Why non-compliance is a real business risk
Skipping PAT testing doesn't just risk a faulty kettle — it risks:
- Enforcement action from the HSE if an inspection or incident reveals unmaintained electrical equipment
- Invalidated insurance — many commercial policies expect evidence of a maintenance regime, and a claim following an electrical fire can be refused without it
- Liability in an accident — if someone is injured by faulty equipment, a lack of records makes it far harder to demonstrate you took reasonable care
- Failed audits — for hospitality, healthcare, and food businesses in particular, PAT records are a standard part of due diligence checks from landlords, franchisors, and environmental health
What good compliance looks like
- A risk-based testing schedule, not a blanket annual assumption
- Testing carried out by a competent, insured engineer
- Clear pass/fail labelling on every item tested
- A digital or paper asset register and certificate you can produce immediately if asked
- A rolling programme so nothing falls overdue between visits

